SENZERO PET — PET MATTRESS QUALITY PROBLEM REPORT Prepared by the Senzero Team, 13 November 2026 Article: https://senzeropet.com/insights/pet-mattress-quality-problem-supplier-report Use this blank tool to report observations and coordinate a review. It is not a warranty, acceptance of responsibility or confirmed remedy. Leave unknown information marked UNKNOWN; do not enter zero for an unchecked quantity or assume a cause. Keep the initial record and date later revisions. Share relevant order evidence privately; omit unrelated customer personal details. 1. REPORT AND ORDER Report reference: Created date / latest revision date: Buyer company and contact: Supplier / existing order representative: Purchase-order reference: Shipment / delivery reference: Receiving location: Date and time received: First observation date and location: Stage first noticed: delivery / unpacking / storage / use / other Short factual summary: Current stock location and handling status: 2. PRODUCT IDENTIFICATION AND QUANTITIES Copy this block for each product variant. Keep units and cartons distinct. Model / SKU: Dimensions and measurement units: Core / cover / color or fabric reference: Accepted specification and sample revision: Available batch / carton / unit identifiers (or NOT AVAILABLE): Reference photos / files: Ordered units: Received units for this shipment: Inspected units from this shipment: How inspected items were selected: Unique inspected units with one or more reported issues: Inspected units with none of the reported issues observed: Uninspected received units: Quantity discrepancies / short delivery (record separately): Scope status: provisional / inspection completed for the stated scope Reconcile only within the same variant and shipment: - Received units = inspected units + uninspected received units. - Inspected units = unique affected units + inspected units with none of the reported issues observed. - Count each affected unit once in the total, even when it appears under several issue types. - Issue-occurrence counts can exceed the number of unique affected units. Do not sum issue blocks to obtain the unique affected total without deduplicating unit identifiers. - Condition of uninspected items remains unknown. A checked subset does not establish the whole-shipment defect rate. 3. ISSUE DETAIL — COPY FOR EACH ISSUE TYPE Issue reference: Affected model / variant / shipment: Related unit identifiers (create traceable local IDs if needed): Number of distinct inspected units with this issue: Do any of these units also appear in another issue block? References: OBSERVED FACTS What is visible or measurable: Location on the product: Accepted requirement / reference being compared: Measured result and units, if relevant: Measuring points, method and product orientation: Time since unpacking / preparation followed, if relevant: Agreed tolerance or criterion and source (or NOT CONFIRMED): Packaging condition when observed: Evidence file references: Information still unknown: CAUSE — NOT YET ESTABLISHED UNLESS SUPPORTED Questions to investigate: Possible explanations, clearly labelled as hypotheses: Supplier's reviewed finding, supporting evidence and date (when available): Buyer review / remaining disagreement or uncertainty: REQUEST — SUBJECT TO AGREEMENT Buyer's requested outcome: Further inspection or information requested by supplier: Any proposed handling action (not yet agreed): Action actually agreed, by whom and when: Relevant order / agreement reference: 4. EVIDENCE FILE LIST — COPY FOR EACH FILE File name: Related report / issue / unit reference: Date captured: View: identification / whole item / detail / packaging / measurement / operation What the file shows: Measurement scale / conditions if relevant: Original retained at: Shared with / date / method: Suggested evidence, as relevant: [ ] Product and carton identification [ ] Whole item showing the issue location [ ] Clear close-up linked to the same item [ ] Measurements with the method and units stated [ ] Outer and inner packaging condition, if available [ ] Short operational video where helpful, without forcing components [ ] Accepted specification / sample reference 5. RECEIPT-TO-OBSERVATION TIMELINE For each entry record date, place, event, known conditions and evidence reference. Delivery and receiving: Unpacking: Storage and handling: First use, if any: Cleaning / washing, if any (instructions followed and settings used): First observation: Later observations: Any cleaning, repair, disassembly or other change after discovery; reason: Unknown stages: Keep affected units and relevant packaging available for review where practical. Record necessary handling actions. Confirm further examination before cutting open or dismantling a mattress. 6. REVIEW AND ACTION LOG — COPY FOR EACH ACTION Action reference / related issue: Evidence received or further information needed: Action proposed: Action agreed: Responsible person: Agreed next review / completion date: Agreement reference and date: Any agreed scope, costs or responsibilities: Result and evidence: Status: open / awaiting information / investigating / action agreed / checking result / closed Latest update and date: 7. CLOSURE RECORD Report / issue reference: Conclusion and supporting evidence: Any unresolved point: Agreed action completed: Result checked by receiver, method and date: Buyer confirmation: Supplier confirmation: Closure date, if agreed: Follow-up required: Acknowledging receipt of this report does not establish the cause or accept a proposed remedy. Returns, replacements, repairs, credits, cost allocation and other arrangements require confirmation for the actual order. Do not enter assumed response deadlines, warranty terms or compensation conditions.