SENZERO PET — SEASONAL LAUNCH PLANNING WORKSHEET Prepared 12 November 2026 Article: https://senzeropet.com/insights/pet-mattress-seasonal-launch-order-timeline Use one plan for an agreed order scope. Copy delivery sections for separate destinations or phases. This is a planning tool, not a quotation, production reservation or delivery guarantee. Keep buyer targets, current estimates and confirmed commitments separate. Leave unknown items open and name the person responsible for confirmation. 1. PROJECT AND DESTINATION Buyer / brand: Supplier contact: Project reference and plan revision: Product model / construction direction: Finished dimensions and units: Fabric / color references: Quantity by size and color (attach the variant list): Target market and sales channel: Receiving warehouse / named destination: Transport responsibility and agreed delivery scope: Logistics contact: Planned sales launch date: Required warehouse arrival date: Staged or multiple-location deliveries: Current sample status and reference: Branding / label requirements: Packing requirements: 2. WORK BACKWARDS FROM LAUNCH For EVERY milestone, complete this block: Milestone name: Buyer target date: Current estimated date / duration: Confirmed commitment (if any): Duration basis: working days / calendar days / other specified basis Activities that must finish before this milestone: Activities that can overlap, confirmed by: Person responsible: Evidence / confirmation reference and date: Contingency allowance, reason and owner: Open point and next confirmation date: Status: target only / estimated / confirmed / completed / changed Apply the block above to: [ ] Stock ready for the sales launch [ ] Warehouse receiving, checks, sorting and inventory preparation [ ] Warehouse arrival / each delivery phase [ ] Transport and handovers, including applicable clearance and final delivery [ ] Dispatch readiness and shipment release [ ] Agreed finished-goods inspection and packing approval [ ] Production release and manufacturing stages [ ] Materials and component readiness [ ] Sample review, any revisions and final approval [ ] Label / artwork / packaging confirmation [ ] Order mix, quotation and commercial release conditions Planning check: [ ] The date the supplier dispatches is not confused with warehouse arrival [ ] Sequential task durations are included once [ ] Overlapping tasks are only treated as parallel when confirmed [ ] Each handover waits for all required inputs [ ] Contingency is visible and not counted twice [ ] Relevant calendars, shutdowns and holidays have been checked for this project [ ] Every date states whether it is a target, estimate or confirmed commitment 3. WHAT STARTS PRODUCTION LEAD TIME? Supplier's stated start event: Quoted lead time and its scope: Date / reference of the supplier confirmation: Record reference, approver, date and open points for each condition: Approved sample and revision: Approved dimensions, core, cover and supplied components: Accepted quantity list by size and color: Material availability / sourcing confirmation: Label and artwork approval: Packing specification and carton marks: Agreed order / payment conditions: Other prerequisites: All required conditions complete, confirmed by / date: Production-release date confirmed by supplier: Expected dispatch date and status: Arrival estimate confirmed by logistics contact: 4. CHANGE LOG — COPY FOR EACH CHANGE Change reference and request date: Previous approved specification / plan revision: Requested change and reason: Affected order lines: Affected materials, samples, artwork, manufacturing or packing: New approval required and responsible person: Cost / quantity effects requiring confirmation: Revised estimate and its basis: Effect on dispatch, arrival and sales launch: Options reviewed (for example revised assortment or launch date): Buyer decision, approver and date: Supplier confirmation reference and date: Logistics reconfirmation reference and date, if affected: New agreed plan revision: 5. FINAL REVIEW BEFORE RELYING ON THE PLAN [ ] Order mix matches the accepted specification and sample versions [ ] Required approvals and their owners are identified [ ] Start conditions for production are explicit [ ] Dates for dispatch, arrival and stock availability are distinct [ ] Unresolved assumptions remain visible [ ] Latest changes have been reviewed by the affected parties [ ] Any staged delivery is separately confirmed, including cost and responsibilities Next review date: Open actions and owners: Buyer confirmation: Supplier confirmation: Logistics confirmation: Do not fill missing durations with assumed Senzero lead times. Actual material availability, minimum quantities, sample terms, manufacturing timing and delivery arrangements require project-specific confirmation.